Map / Boulder Urban Renewal Authority (BURA) / 2025-10-28 →
Boulder Urban Renewal Authority (BURA) · regular
9-6-24 Boulder Urban Renewal Authority Meeting
- Date
- Series
- regular
- Status
- past
- Sources
- YouTube, via the Woven archive; YouTube's automatic captions
Agenda
No agenda items read for this meeting.
Excerpts by topic
AI-read · unreviewed13 mentions; quotes verbatim from the captions or agenda, chosen by a model, unchecked by a personSo for some planning context, when the 9th and Canyon Urban renewal plan was originally established back in 1988.
The plan notes these guidelines are not intended to be a checklist, but are to suggest the type and range of options to be considered.
and this pink area is referring to a high hazard flood zone. And then the blue which is most of our site.
in the case for dealing with that increased volume of trash and recycling, with the new addition.
there would also be some outdoor dining as proposed in the southwest corner of the building along the public walkway.
So the bottom line for me, along with flood zone issues, trash, parking, etc, is, there needs to be a dialogue
as it was going through the approval process there were murals and reliefs, and whatever put on that blank wall
you know, 1988 was the original urban renewal plan, and we bought the property prior in 1994
We do have recycling containers in the alley, and we are working to.
They are proposing an amendment to the Bdrc transportation connections.
the transportation Connections plan, which is what we're here to talk about today.
So the 5 foot width public easement is, that is 5 foot. Is that considered handicap accessible.
Plan in particular removal of the East, West, secondary street connection and North South multi-use path connection through the properties subject to proposed site.