- Betasso, utility capital, wastewater, water resource recovery, water treatment plant
- On record
- 101 mentions in 67 meetings explorer count
Which bodies discuss it
AI-read · unreviewedRanked by meetings that mention it. Counts of model-chosen mentions; no person has checked them.
Across bodies and years
Dot size: meetings that mention it that year. Recordings reach back to 2011 for a few bodies and to 2022 for most; agendas only from April 2026.
Every mention, newest first
AI-read · unreviewedEach quote is verbatim from the captions or an agenda item (captions are automatic and may mishear). A mention says the subject came up, never what anyone thinks of it.
2026 12 mentions
undergrounding a power line that serves our wastewater plant and then also undergrounding to our south along Highway 93
In regards to water, wastewater, storm water management, and flood control, staff also found there were adequate facilities
that increase fees by 5% for water utilities, 7% for wastewater utilities, and 7% for storm water flood
So the wastewater um uh blueprint, the um uh transportation blueprint, these are the plans that anticipate future demand
And then those impact fees over time get aggregated to increase the capital structure of say a wastewater
upon completion of the water system, properties must connect exclusively to city water.
we're thinking about our, Major phosphorus upgrades project that took place at the water resource recovery facility.
would be done specific to plant infrastructure or the distribution center, and decisions have to be made
people invest in their fair share of the plant, or the treatment plant, or wastewater treatment plant, and the pipes and distribution
larger wastewater system, the larger sewer system on what amounts to a a per capita basis
the baseline off-site infrastructure costs, including the water lines and wastewater treatment, could reach a billion dollars
Our utilities department really had a demonstration of why capital investments matter.
2025 23 mentions
Water, wastewater, and stormwater management and flood control public facilities are guaranteed by an enforceable development agreement
increasing reliability, resilience, and level of services of the water, wastewater, and storm blood infrastructure
they provide lowinterest loans for local drinking water and wastewater infrastructure projects
That would be a difficult endeavor, or an expensive endeavor for Boulder, because one, we're already a built-out city, so you'd be tearing up a lot of roads to run new pipes.
so that we're not outgrowing our facilities and infrastructure
the water utility fund will support the transmission uh system repair project
definitely want to have a long-term picture of what our infrastructure needs are.
so much of the capital improvement is focused on transportation and utilities
I know there's been some issues of budget for their wastewater system and that sort of thing.
for the remaining projects in the water, wastewater and stormwater and flood management utilities
that's really why we're binding differently in the storm flood utility versus the water and wastewater utility
We do have a bump in our capital spending after this year.
3B is the consideration of a water and wastewater service agreement between the city of Boulder and the University of Colorado at Boulder
a large portion of that bond helped to pay for the MS project
we did recommend a 6% increase for 2027. Um, but due to some, you know, growing capital deeds
we have an ongoing corrosion control disinfection uh project at the Passo water treatment plant
what you're seeing is Boulder Creek has been diverted so we can put the pipes in and lower them under the creek
So from the treatment plants, we have 2 treatment plants here in the city.
So treated, water system really made up. We have water treatment, and we'll do a couple of slides on each of these.
years ago I think we did study what it would take to replace whale Water and Wastewater systems within the parks in the city
The wharf is being upgraded in order to comply with future phosphorus limits.
The 63rd water treatment plant upgrades that were to replace aging infrastructure was substantially completed.
while several large capital improvement projects were advancing in the collection system and at the wharf
2024 32 mentions
we would need to construct a whole new set of infrastructure
check out what the infrastructure costs for the city, go to the reservoir. The water treatment plant
I'm going to testify, just testified with them about water issues for all this growth that's going on.
That's the largest singular pump station in the city of Boulder, and is really the workhorse for getting water
also doing a number of uh upgrades at our water treatment plants and our wastewater treatment plants
in our Capital plans for water and wastewater um we have major transmission lines in the water system
really modeling of the water and wastewater system in particular
and then the thought was to do the November Board meeting at the 63rd Street Water Treatment plant and do a tour of some of the capital project work
the main sewer improvements Phase 2 project is included in the six-year CIP for a total of 9.7 million
a short business meeting and a tour of some of the 63rd Street upgrades or the 63rd Street Water Treatment plant
those larger diameter trunk sewers are all collected on the east side of town in our main interceptor
we're gonna talk about the main sewer Improvements project
Wastewater developed into or sent into the farmers, ditch
So my preliminary evaluations indicate on and off site improvements to the transmission and distribution.
So additional analysis is really required to understand on site and off site improvements as it relates to water, wastewater, etc
Boulder does not have wastewater infrastructure within the planning reserve, and there's no existing stormwater master plan
we talked about potentially bonding in 2028 or 2029 for projects within our water and wastewater funds.
preliminary evaluation has indicated on and offsite upgrades will be needed to the transmission and distribution infrastructure
understand some of the offsite improvements including water and wastewater treatment capacity and infrastructure
we're looking at in 2029 and cip the yellow areas is a phase 3 project
looking at beginning preliminary design work on the tank from Chautauqua in the Chicago area in 2025
3 big projects that we've got in Cip related to the Barker outlet
this is the single largest capital project the city has taken on from a utility system
this slide really shows the Sanitary Sewer Rehabilitation project that we've been going forwards with since 2015.
I'm gonna start with just a quick update on the industrial Pre treatment program. This was in your packet
We are currently performing major capital improvement program updates at the 63rd Street water treatment plant
The city has a history of investing in backup emergency power options for our critical water and wastewater facilities.
Carter Lake pipeline was one uh we had a big one down in
the capital projects we have across all of all three utilities water Wastewater storm and flood
team that does all the capital projects across all three of the utilities water Wastewater storm water and flood
technical infrastructure study to understand the costs and the feasibility of potentially extending city services
Do you know what actions can be taken in that arena that help produce those numbers like more driven more by the efficiency of the water treatment plant
2023 12 mentions
do we have an infrastructure report on impact 2 and requirements from our water and wastewater systems by this project?
We could see that there's a lot of, you know. There's a lot of excess capacity there, because water is going down.
capital improvement work that we've done since then, like the improvements to the wastewater collection system
this was used to fund major upgrades to both liquid stream and solid stream processes at the waste water facility
we put about 40 plus 1 million dollars into the car. Really pipeline for the from Northern water
Now, I'm going to talk about some of this wastewater utility projects wastewater master plan
It's important project, valued at about 5 million dollars is part of several major sewer improvement projects
the electrical and high Service pump station project at the 60 Third Street Water Treatment
a 3 year project which will improve the dam stability and storage volume of Albion Reservoir in the city's upper watershed
our main sewer Improvement project all of the Wastewater collection pipes in the city
we have a couple of water treatment plant projects important ones Electric System up upgrades
keeping up with aging infrastructure is really our biggest challenge in utilities
2022 3 mentions
we have two other utilities water and and Wastewater we'll have future Master
how we cycle through all of our systems and water and wastewater and storm and flood
the four million dollar comes from an estimation of what it would cost to connect utilities to city water and wastewater
2021 8 mentions
Of rainwater that enters our wastewater collection system, and we have certain level of service goals
this is a project that will increase the capacity of our wastewater collection system
major investments in water wastewater stormwater projects that also includes
a big chunk of those numbers in our budget are utilities so water wastewater and storm water are a huge component of the funding
this is our main sewer interceptor project so this is the main sewer that leads basically from from all of town
three large water utility projects one large wastewater utility project
a contemporary problem however is that clay tiles were used for the pipes and they were used for many decades
continued work around the aging infrastructure and capital improvement projects for utilities
2020 3 mentions
so the middle photo on this slide represents replacement of the the main Interceptor uh Wastewater pipe
in our water utility we have critical system components that in some cases are 100 years old
upgrades to the 'but a so water treatment plan resulted in a 20% improvement in filter efficiencies
2019 4 mentions
the spike in 2222 reflects large projects and the utilities specifically around regulatory improvements to the boulder water resource recovery facility
that the systems could handle in terms of water and wastewater
so the utility fund just for an example the wastewater fund has 32 million dollars alone in CIP
our own water treatment plant and our own sewer plant and the sewer plant by state law has to be brought up to code
2018 3 mentions
the wastewater treatment plant has just commissioned a study to look at upgrading our digesters out there
aggressively go after our aging clay pipe wastewater collection system and that allowed us both to implement a comprehensive inspection program
I've focused for 2019 both in capital and operating as on asset management and regulatory compliance
2017 1 mention
that is a Carter Lake pipeline which is about 32 million dollars